Boco Rock Wind Farm

113 MW, New South Wales, Australia

Boco Rock Wind Farm is a 113.18 MW wind farm located 10km south west of Nimmitabel and 30km north of Bombala in NSW, Australia. CWP Renewables developed the project, which was sold to Thai utility EGCO in 2013.

CWP Renewables acted as Principal’s Representative during the project’s construction, which was delivered two months ahead of schedule and below budget. CWP is asset managing Boco Rock Wind Farm throughout the operations period.

Visit the project website

Sapphire Wind Farm

270 MW, New South Wales, Australia

The 270 MW Sapphire Wind Farm is currently under construction near Glen Innes in NSW, Australia.

When complete, the 75 turbines in this project will provide enough clean energy to power around 115,000 homes and displace 700,000 tonnes of carbon dioxide each year. It also brings many economic benefits to NSW’s New England region, including over 150 new jobs, as well as to the ACT capital region.

Through the Power Purchase Agreement signed with the ACT Government, Sapphire Wind Farm is helping the ACT meet its target of 100% renewables by 2020.

CWP Renewables developed the project, and is asset managing the project through construction and long-term operations.

Visit the project website

Crudine Ridge Wind Farm

134 MW, New South Wales, Australia

Crudine Ridge Wind Farm is a 37 turbine, 134MW wind farm located approximately 45 km south of Mudgee, NSW, Australia.

CWP Renewables developed the project and successfully secured a power purchase agreement (PPA) for the project in early 2018. The project commenced construction in May 2018 and will create over 75 jobs during construction. The wind farm will be fully commissioned in 2019 and will contribute over $168,000 to community benefits annually throughout operations.

CWP Renewables developed the project, and is asset managing the project through construction and long-term operations.

Visit the project website

Bango Wind Farm

c.200 MW, New South Wales, Australia

Bango Wind Farm is a project consisting of up to 71 turbines located near the townships of Boorowa and Rye Park, north of Yass in NSW. The region has a strong wind resource which has been monitored for over ten years. The project will commence construction in early 2019 and is expected to produce enough clean energy to power around 85,000 homes.

CWP Renewables has been developing the project since the site was identified in 2008.

Visit the project website

Uungula Wind Farm

c.400 MW, New South Wales, Australia

Uungula Wind Farm is a proposed development of c.600MW in the central west region of NSW between the towns of Wellington and Gulgong, NSW. The location has a reliable wind resource which has been measured over ten years, and will connect directly to the existing transmission network. The project is expected to commence construction in 2020.

CWP Renewables has been developing the project since the site was first identified in 2008.

Visit the project website

European Projects

South Eastern Europe, wind and solar.

  • Cibuk 1 Wind Farm, Serbia
  • Fantanele-Cogealac Wind Farm, Romania
  • Oreshets Solar Farm, Bulgaria

Find out more